Modified :
11/22/2015
Here is a set of before and after pictures of some custom wood-work in DC. The shelving unit was designed by someone else, but I did all the construction. The stair treads were designed and built by myself. The flooring was done by myself and helpers.
Modified :
03/14/2013
Here is a deck I completely redid. All work was either done, or supervised by me. Of course I had help with a lot of the redundant work, but the design was done by me.
Modified :
03/07/2013
These are before and after pictures of tile backsplashes I have done.
Modified :
03/04/2013
This was a laundry room in Northern Virginia. The job required moving electrical, moving 2" PVC vent pipes (3 of them), framing, and then the fine-finishing. All but the floor was done by me.
Modified :
03/04/2013
This is a two-room renovation I did in Northern Virginia. An unfinished room was converted into an office/small gym. The other room was an unfinished laundry room, which was finished. The job included plumbing, drywall, electrical, framing and cabinet hanging.
©2018 Daniel Nicholson